North Fambridge Platform Extension

North FambridgeThe main aim of the North Fambridge Loop Extension project was to provide the appropriate infrastructure to facilitate the introduction of 12 car trains between Liverpool Street and Wickford stations, some of these continuing albeit with rear 4 carriages locked out of use to Southminster Station. The Rail Tech Group was selected by C Spencer Ltd to undertake all the signalling changes that were required as part of the overall platform extension scheme. This included all GRIP 6-8 deliverables including the project management, CRE responsibilities, task briefing, work package planning and the procurement, installation and test & commissioning of all signalling assets.
The signalling in the station area was controlled from London Liverpool Street via a SSI style interlocking and utilised colour light signals and track circuit block. The existing arrangements for train detection in the area around Fambridge station were predominantly DC medium voltage, AC immune track circuits and these were retained throughout to maintain uniformity of design and to retain the required levels of immunisation.
During the programme of works, the major blockade date was brought forward and subsequently an accelerated programme was put in place. Despite this significant change in prgramme all deliverables were met and remained on time and within budget.

Client

C Spencer

Project Value

£125,000

Duration

June 2011 – August 2011

Activities Undertaken

Alterations to existing track circuits (BC, BD, BE, BH & BJ)
Installation of new signals 696 & 651
Installation of new 696/651 TSS & OSS
Installation of new 696 AWS
Installation of new 2334 In-Bearer Clamplock Point Machine
Installation of new pre-fabricated Location 60/38 Case
Alterations & Wiring Modifications to the existing interlocking & locations
Repositioning of Signal Post Telephones
Signal Works Testing / Commissioning of new Signalling equipment.
Decommission and Removal of redundant signalling equipment.

Client Contact

John Waugh - C Spencer Signalling Project Manager
Reference Available Upon Request